Nu-lok roofing system

Nu-lok technology brings the traditional elegance of slate roof into a whole new light.

To see more detail, click the images
 
 

Nu-lok Roofing Systems is used in various climates around the world, this system uses a lightweight galvanized steel batten and link channel installation system. This allows broken or damaged slate to be replaced in minutes, without noticeable evidence. This minimizes labor, materials and maintenance costs and is an unbeatable long-term investment in your property. This batten and link channel fastening system will support either natural slate or nu-lok’s ceramic slate. No need to go with artificial slates anymore.

DETAILS

BENEFITS


Material Specifications

Link Channel:

Batten:

Wire Clip:

Ceramic Slate:

Natural Vermont Slate


System Specifications:



Results of U.S. Testing

Fire Resistance of System:

Under ASTM E-108: Passed the standard required for Class ‘A’

Installed Weight of System:

Under ICBO Acceptance Criteria for Clay and Concrete Roof Tiles, AC180 2002, and Section 3.1.4: Installed Weight determined as 5.6 pounds per square foot

Strength of Ceramic Slate:

Under ICBO Acceptance Criteria for Clay and Concrete Roof Tiles, AC180 2002, Section 3.1.2, UBD Standard 15-5, Slate strength determined as more than two times required standard

Water Absorption of Ceramic Slate:

Under ICBO Acceptance Criteria for Clay and Concrete Roof Tiles, AC180 2002, and Section 3.1.3: Water absorption determined to be 0.2%

Resistance to Freezing and Thawing of Ceramic Slate:

Under ICBO, Acceptance Criteria for Clay and Concrete Roof Tiles, AC180 2002, and Section 4.5: No breakage; no disintegration; 0% weight loss.



Warranty

Once a roof has been installed, and after it has been, first, accepted by the property owner and their architect if applicable, and second, certified as correctly installed by a licensed roofing contractor approved by nu-lok USA, then a certificate of 50-year warranty is issued by Nu-Lok Roofing Systems.

A two-year warranty is provided by nu-lok USA as part of the sales contract for each order. This is intended to provided protection for problems that might occur from the date of purchase, through shipment, while waiting on site for installation and up through installation acceptance.